Specialists of the Moscow Metrostroy construction company completed the major overhaul of the Studencheskaya station, partially closed to passengers in the direction of the center in the third quarter of 2017.
The reconstruction of the platform sites consisted in replacing the materials for the finishing of the platform, track walls and roofing. Instead of asphalt on the platforms appeared hardened granite of dark color, and the cover above them is made of roofing sandwich panels, under which are installed infrared heaters.
Travel walls on the Studencheskaya are lined with glass stained-glass windows and decorative HPL-panels. New lighting is installed, and all lamps are replaced with energy-saving ones. The new decoration made the appearance of the station light and modern.
According to the project, during the finishing materials of domestic producers were used. In order to increase the energy efficiency of the facility, special glass was used, which reduces the heating of the premises in the summer and prevents the loss of heat in the winter.
Name |
Before reconstruction |
After reconstruction |
VESTIBULE |
||
Floor |
Ceramic tiles |
Granite slabs |
Walls |
Ceramic tiles |
Porcelain tiles |
Ceiling |
Plastering, painting |
Plastering, painting |
Stained Glass |
Double stained glass windows (showcase type) |
Single-glazed window with energy-efficient glass filling |
Lighting |
Fluorescent lamps |
LED lights |
The basement of the facade |
Ceramic tiles |
Granite slabs |
New facade details |
---- |
Ventilated facade (granite slabs) on the subsystem |
PLATFORM |
||
Floor |
Asphalt coating |
Granite slabs |
Tunnel walls |
Concrete wall |
Decorative wall of metal facade panels with plotter printing; granite base |
Platform Coverage |
Corrugated board for concrete beams |
Roof sandwich panel on beams with a decorative coating and built-in lighting |
Railings, fences |
Painted black metal |
Grinded stainless steel |